Total Build Time: 2027.5 hours
This index lists all posts by category for every portion of the build. Use the following links to jump to the appropriate section.
- Empennage
- Wings
- Fuselage
- Fastback modification (includes canopy work)
- Firewall Forward
- Painting and Detailing
- Electrical
- Finishing
- Final Testing
- Uncategorized
Flying (7.3 hours)
- First RV-7 Flight (0 hrs) (7/14/2012)
- First flight in an RV-8 (0 hrs) (8/25/2012)
- Aero in Mike’s RV-7 (5/27/2013)
- Flying with Jack (8/31/2013)
- Cambridge with Jack & Mike (1/12/2014)
- Frederick Lunch Flight (1/19/2014)
- Oshkosh 2014! (8/13/2014)
- ¡VIVA CHILE! (1/24/2015)
- Sun ‘N Fun – 2016 (4/12/2016)
- CFI Practical Exam Notes (2/20/2017)
- Tailwheel Endorsement (5/7/2017)
- CFI-I Add-On Practical Exam Notes (8/2/2017)
- Commercial Multi-Engine Add-On (12/5/2017)
- Helicopter Intro (3/15/2018)
- Multi-Engine Instructor (3/20/2018)
- Helicopter Private Pilot Add-On (12/4/2018)
- Recent Helicopter Flights (5/14/2019)
- Trip to Pittsburgh (5/14/2019)
- Instrument Helicopter Add-On (5/21/2019)
- Flight to John’s (6/1/2019)
- McLean Clan Visit (6/9/2019)
- Helicopter Intro for my mum (9/5/2019)
- Triple Tree Fly-in (9/8/2019)
- Eastern shore R-22 with Steven (10/5/2019)
- The Snyder Family (10/16/2019)
- Ski Whitetail in the R-44 (12/23/2019)
- Yard Hopping (12/30/2019)
- Solo over York County (1/26/2020)
- Dad and Uncle Joe (2/9/2020)
- Helo lunch with Maja (2/21/2020)
- Bullock flies the R-44! (2/23/2020)
- First Flight!!!! (6/15/2023)
- Flying & Performance – First report (7/2/2023)
Maintenance (37 hours)
- First Flight!!!! (6/15/2023)
- Maintenance and Tuning – First report (7/2/2023)
- Induction snorkel & oil cooler bypass (7/3/2023)
- Nose Seal: Part deux (7/3/2023)
Empennage (273.5 hours)
Horizontal Stabilizer (72 hours)
- Horizontal Stab 1 (12/16/2012)
- Horizontal Stab 2 (1 hr) (12/18/2012)
- Horizontal Stab 3 (0 hrs) (12/19/2012)
- Horizontal Stab 4 (0 hrs) (12/22/2012)
- Horizontal Stab 5 (1.75 hrs) (1/19/2013)
- Horizontal Stab 6 (2 hrs) (1/30/2013)
- Horizontal Stab 7 (1 hr) (2/6/2013)
- Horizontal Stab 8 (1 hr) (2/11/2013)
- Horizontal Stab 9 (2.0 hrs) (2/13/2013)
- Horizontal Stab 10 (1.5 hrs) (2/13/2013)
- Horizontal Stab 11 (0.5 hr) (2/14/2013)
- Horizontal Stab 12 (2.5 hrs) (2/15/2013)
- Horizontal Stab 13 (4.5 hrs) (2/23/2013)
- Horizontal Stab 14 (3.0 hrs) (2/24/2013)
- Horizontal Stab 15 (0.5 hr) (2/26/2013)
- Horizontal Stab 16 (4.0 hrs) (3/9/2013)
- Horizontal Stab 17 (1.0 hr) (3/17/2013)
- Horizontal Stab 18 (1.5 hrs) (3/19/2013)
- Horizontal Stab 19 (0.75 hr) (3/21/2013)
- Horizontal Stab 20 (6.5 hrs) (4/6/2013)
- Horizontal Stab 21 (5.0 hrs) (4/7/2013)
- Service Bulletin 14-01-31 (1) (1/14/2016)
- Service Bulletin 14-01-31 (2) (1/16/2016)
- Service Bulletin 14-01-31 (3) (1/18/2016)
- Service Bulletin 14-01-31 (4) (2/1/2016)
- Service Bulletin 14-01-31 (5) (3/1/2016)
- Service Bulletin 14-01-31 (6) (3/5/2016)
- Service Bulletin 14-01-31 (7) (3/8/2016)
- Service Bulletin 14-01-31 (8) (3/9/2016)
- Empennage Tips 1 (5/27/2016)
Vertical Stabilizer (23.25 hours)
- Vertical Stab 1 (0.25 hr) (4/7/2013)
- Vertical Stab 2 (2.0 hrs) (4/8/2013)
- Vertical Stab 3 (3.0 hrs) (4/9/2013)
- Vertical Stab 4 (5.0 hrs) (4/13/2013)
- MARATHON! Vertical Stab 5 / Rudder 7 (13.0 hrs) (4/20/2013)
Elevators (87.25 hours)
- Elevators 1 (4.0 hours) (5/5/2013)
- Elevators 2 (0.5 hr) (5/6/2013)
- Elevators 3 (0.75 hr) (5/7/2013)
- Elevators 4 (2.0 hrs) (5/9/2013)
- Elevators 5 (2.0 hrs) (5/10/2013)
- Elevators 6 (1.5 hrs) (5/11/2013)
- Elevators 7 (1.5 hrs) (5/13/2013)
- Elevators 8 (2.0 hrs) (5/19/2013)
- Elevators 9 (3.0 hrs) (5/19/2013)
- Elevators 10 (4.0 hrs) (5/26/2013)
- Elevators 11 (4.0 hrs) (5/27/2013)
- Elevators 12 (1.0 hr) (6/5/2013)
- Elevators 13 (2.0 hrs) (6/8/2013)
- Elevators 14 (5.0 hrs) (6/9/2013)
- Elevators 15 (2.5 hrs) (6/15/2013)
- Elevators 16 (1.0 hr) (6/16/2013)
- EAA Tech Counselor Inspection (6/27/2013)
- Elevators 17 (3.5 hrs) (6/29/2013)
- Elevators 18 (1.5 hrs) (7/4/2013)
- Elevators 19 (1.5 hrs) (7/5/2013)
- Elevators 20 (4.5 hrs) (7/7/2013)
- Ordered new left elevator (7/8/2013)
- Elevators 21 (5.0 hours) (7/20/2013)
- Elevators 22 (2.0 hrs) (7/21/2013)
- Elevators 23 (0.5 hr) (7/21/2013)
- Elevators 24 (2.0 hrs) (7/24/2013)
- Elevators 25 (1.25 hrs) (7/25/2013)
- Elevators 26 (1.25 hrs) (7/26/2013)
- Elevators 27 (1.5 hrs) (7/27/2013)
- Elevators 28 (4.0 hrs) (7/28/2013)
- A little bit of everything… (3.0 hrs) (8/9/2013)
- Elevators 29 (1.0 hr) (9/18/2013)
- Elevators 30 (4.0 hrs) (9/21/2013)
- Empennage Tips 1 (5/27/2016)
- Empennage Tips 3 (6/3/2016)
- Empennage tips 5 (6/10/2016)
Rudder (41 hours)
- Rudder 1 (1.0 hr) (4/13/2013)
- Rudder 2 (2.0 hrs) (4/13/2013)
- Rudder 3 (1.0 hr) (4/14/2013)
- Rudder 4 (1.5 hrs) (4/16/2013)
- Rudder 5 (1.0 hr) (4/17/2013)
- Rudder 6 (0.5 hr) (4/18/2013)
- MARATHON! Vertical Stab 5 / Rudder 7 (13.0 hrs) (4/20/2013)
- Rudder 8 (1.0 hr) (4/27/2013)
- Rudder Problems (4/27/2013)
- Rudder 9 (2.0 hrs) (4/28/2013)
- Rudder 10 (1.5 hrs) (4/30/2013)
- Rudder 11 (1.0 hr) (5/2/2013)
- Rudder 12 (1.0 hr) (5/19/2013)
- Rudder 13 (0.75 hr) (5/21/2013)
- Rudder 14 (4.0 hrs) (5/26/2013)
- Rudder 15 Complete (almost!) (1.5 hrs) (5/27/2013)
- Empennage Tips 2 (5/28/2016)
- Empennage Tips 4 (6/5/2016)
- Tailwheel Steering Link (4/7/2022)
Trim Tab (11 hours)
- Trim Tab 1 (3.5 hours) (7/12/2013)
- Trim Tab 3 (2.0 hrs) (8/10/2013)
- Trim Tab 4 (1.5 hours) (8/11/2013)
- Trim Tab 5 (2.0 hrs) (8/12/2013)
- Trim Tab 6 (1.0 hr) (8/14/2013)
- Trim Tab 7 (1.0 hr) (8/15/2013)
Wings (482.75 hours)
Spars (26.75 hours)
- Wing Spars 1 (4.0 hrs) (9/21/2013)
- Wing Spars 2 (3.0 hrs) (9/22/2013)
- Wing Spars 3 (3.0 hrs) (9/28/2013)
- Wing Spars 4 (3.0 hrs) (9/29/2013)
- Wing Spars 5 (1.0 hrs) (9/29/2013)
- Wing Spars 6 (0.5 hr) (10/1/2013)
- Wing Spars 7 (2.0 hrs) (10/5/2013)
- Wing Spars 8 (4.0 hrs) (10/6/2013)
- Wing Spars 9 (1.0 hr) (10/7/2013)
- Wing Spars 10 (0.75 hr) (10/9/2013)
- Wing Spars 11 (1.0 hr) (10/12/2013)
- Wing Spars 12 (2.0 hrs) (10/14/2013)
- Wing Spars 13 (1.5 hrs) (10/20/2013)
Wing Structure (225 hours)
- Wings 1 (5.0 hrs) (10/12/2013)
- Wings 2 (5.0 hrs) (10/13/2013)
- Wings 3 (3.0 hrs) (10/14/2013)
- Wings 4 (8.0 hrs) (10/27/2013)
- Wings 5 (7.0 hrs) (10/27/2013)
- Wings 6 (12.0 hrs) (11/4/2013)
- Wings 7 (2.0 hrs) (11/4/2013)
- Wings 8 (4.0 hrs) (11/10/2013)
- Wings 9 (4.5 hrs) (11/11/2013)
- Wings 10 (3.0 hrs) (11/30/2013)
- Wings 11 (2.0 hrs) (11/30/2013)
- Wings 12 (1.0 hr) (12/1/2013)
- Wings 13 (1.0 hr) (12/21/2013)
- Wings 14 (1.0 hr) (3/14/2014)
- Wings 15 (6.0 hrs) (3/18/2014)
- Wings 16 (6.0 hrs) (3/27/2014)
- Wings 17 (2.5 hrs) (3/29/2014)
- Wings 18 (5.0 hrs) (3/30/2014)
- Wings 19 (5.0 hrs) (3/30/2014)
- Wings 20 (4.0 hrs) (4/7/2014)
- Wings 21 (11.0 hrs) (4/13/2014)
- Wings 22 (3.0 hrs) (4/20/2014)
- Wings 23 (4.0 hrs) (4/24/2014)
- Wings 24 (5.0 hrs) (6/2/2014)
- Wings 25 (0.5 hrs) (6/8/2014)
- Wings 26 (4.0 hrs) (6/17/2014)
- Wings 27 (6.0 hrs) (7/6/2014)
- Wings 28 (5.0 hrs) (7/19/2014)
- Wings 29 (2.0 hrs) (8/7/2014)
- Wings 30 (4.0 hrs) (8/9/2014)
- Wings 31 (5.5 hrs) (8/10/2014)
- Wings 32 (3.5 hrs) (10/12/2014)
- Wings 33 (4.0 hrs) (11/9/2014)
- Wings 34 (2.0 hrs) (11/22/2014)
- Wings 35 (5.0 hrs) (11/23/2014)
- Wings 36 (6.0 hrs) (11/28/2014)
- Landing Lights 1 (5.0 hrs) (12/30/2014)
- Landing Lights 2 (3.5 hrs) (2/1/2015)
- Ailerons 15 (1.5 hrs) (2/27/2015)
- Ailerons 16 (6.0 hrs) (2/28/2015)
- Ailerons 17 (3.0 hrs) (3/1/2015)
- Ailerons 18 (2.0 hr) (3/6/2015)
- Wings 37 (1.0 hr) (3/27/2015)
- Wings 38 (5.0 hrs) (3/29/2015)
- Multiple Sessions (12.0 hrs) (4/26/2015)
- Wings 39 (4.0 hrs) (5/5/2015)
- Wings 40 (2.0 hrs) (5/10/2015)
- Wings 41 (4.0 hrs) (5/24/2015)
- Wings 42 (0.5 hr) (6/22/2015)
- Wings 43 (8/21/2017)
- Bottom Wing Skins (2/4/2021)
- Wing Intersection Fairings (11/8/2021)
Fuel Tanks (161 hours)
- Fuel Tanks 1 (4.0 hrs) (12/21/2013)
- Fuel Tanks 2 (1.5 hrs) (12/21/2013)
- Fuel Tanks 3 (6.5 hrs) (12/26/2013)
- Fuel Tanks 4 (6.0 hrs) (12/29/2013)
- Fuel Tanks 5 (5.0 hrs) (1/1/2014)
- Fuel Tanks 6 (2.0 hrs) (1/10/2014)
- Fuel Tanks 7 (2.0 hrs) (1/11/2014)
- Fuel Tanks 8 (2.0 hrs) (1/14/2014)
- Fuel Tanks 9 (3.0 hrs) (1/14/2014)
- Fuel Tanks 10 (1.0 hr) (1/19/2014)
- Fuel Tanks 11 (6.0 hrs) (1/20/2014)
- Fuel Tanks 12 (4.0 hrs) (1/25/2014)
- Fuel Tanks 13 (5.5 hrs) (1/26/2014)
- Fuel Tanks 14 (7.0 hrs) (2/8/2014)
- Fuel Tanks 15 (4.5 hrs) (2/10/2014)
- Fuel Tanks 16 (8.0 hours) (2/18/2014)
- Fuel Tanks 17 (4.0 hrs) (2/23/2014)
- Fuel Tanks 18 (8.0 hours) (2/24/2014)
- Fuel Tanks 19 (6.0 hrs) (3/1/2014)
- Fuel Tanks 20 (5.0 hrs) (3/6/2014)
- Fuel Tanks 21 (6.0 hrs) (3/9/2014)
- Fuel Tanks 22 (6.0 hrs) (3/10/2014)
- Fuel Tanks 23 (2.0 hrs) (4/13/2014)
- Fuel Tanks 24 (6.0 hrs) (4/20/2014)
- Fuel Tanks 25 (3.5 hrs) (6/8/2014)
- Fuel Tanks 26 (1.0 hrs) (7/6/2014)
- Fuel Tanks 27 (4.5 hrs) (7/12/2014)
- Fuel Tanks 28 (5.0 hrs) (7/12/2014)
- Fuel Tanks 29 (3.5 hrs) (12/1/2014)
- Fuel Tanks 30 (0.5 hr) (12/7/2014)
- Fuel Tanks 31 (8.0 hrs) (3/8/2015)
- Fuel Tanks 32 (2.0 hrs) (4/21/2015)
- Multiple Sessions (12.0 hrs) (4/26/2015)
- Fuel Tanks 33 (2.5 hrs) (5/9/2015)
- Fuel Tanks 34 (3.0 hrs) (5/10/2015)
- Fuel Tanks 35 (1.0 hr) (5/18/2015)
- Fuel Tanks (0.5 hr) (6/22/2015)
- Starter solenoid wiring, pitot wiring, fuel vents. (8/12/2022)
Ailerons (53.5 hours)
- Ailerons 1 (3.5 hrs) (9/1/2014)
- Ailerons 2 (3.5 hrs) (9/1/2014)
- Ailerons 3 (3.5 hrs) (9/8/2014)
- Ailerons 4 (2.0 hrs) (9/10/2014)
- Ailerons 5 (4.0 hrs) (9/13/2014)
- Ailerons 6 (2.5 hrs) (9/29/2014)
- Ailerons 7 (2.0 hrs) (9/30/2014)
- Ailerons 8 (2.0 hrs) (10/2/2014)
- Ailerons 9 (3.0 hrs) (10/3/2014)
- Ailerons 10 (6.0 hrs) (10/4/2014)
- Ailerons 11 (5.0 hrs) (10/5/2014)
- Ailerons 12 (1.0 hr) (10/8/2014)
- Ailerons 13 (2.0 hrs) (10/9/2014)
- Ailerons 14 (1.0 hr) (2/21/2015)
- Ailerons 15 (1.5 hrs) (2/27/2015)
- Ailerons 16 (6.0 hrs) (2/28/2015)
- Ailerons 17 (3.0 hrs) (3/1/2015)
- Ailerons 18 (2.0 hr) (3/6/2015)
Flaps (51 hours)
- Flaps 1 (2.0 hrs) (8/30/2014)
- Flaps 2 (1.0 hrs) (9/1/2014)
- Flaps 3 (6.0 hrs) (12/15/2014)
- Flaps 4 (3.0 hrs) (12/16/2014)
- Flaps 5 (2.5 hrs) (12/20/2014)
- Flaps 6 (3.0 hrs) (12/22/2014)
- Flaps 7 (1.0 hr) (12/23/2014)
- Flaps 8 (6.0 hrs) (12/24/2014)
- Flaps 9 (2.0 hrs) (12/27/2014)
- Flaps 10 (4.0 hrs) (2/1/2015)
- Flaps 11 (2.5 hrs) (2/13/2015)
- Flaps 12 (6.0 hrs) (2/14/2015)
- Flaps 13 (4.0 hrs) (2/15/2015)
- Wing Intersection Fairings (11/8/2021)
Wing Tips
Fuselage (305.5 hours)
Main Fuselage (239.5 hours)
- Fuselage 1 (5.0 hrs) (5/16/2015)
- Fuselage 2 (2.0 hrs) (5/19/2015)
- Fuselage 3 (2.0 hrs) (5/20/2015)
- Fuselage 4 (1.0 hr) (5/22/2015)
- Fuselage 5 (6.5 hrs) (5/23/2015)
- Fuselage 6 (3.0 hrs) (5/25/2015)
- Fuselage 7 (1.5 hrs) (5/31/2015)
- Fuselage 8 (3.0 hrs) (6/1/2015)
- Fuselage 9 (1.5 hrs) (6/3/2015)
- Fuselage 10 (4.0 hrs) (6/7/2015)
- Fuselage 11 (2.0 hrs) (6/22/2015)
- Fuselage 12 (3.0 hrs) (6/25/2015)
- Fuselage 13 (3.0 hrs) (6/26/2015)
- Fuselage 14 (2.0) (6/29/2015)
- Fuselage 15 (3.5) (7/2/2015)
- Fuselage 16 (4.0 hrs) (7/19/2015)
- Fuselage 17 (5.0 hrs) (7/26/2015)
- Fuselage 18 – Rudder pedals (8/16/2015)
- Fuselage 19 – Priming multiple parts (9/20/2015)
- Fuselage 20 – More Priming (9/27/2015)
- Fuselage 21 – Return from priming (10/25/2015)
- Fuselage 22 – Seats and Floors (10/31/2015)
- Fuselage 23 – Misc Work (11/1/2015)
- Fuselage 24 – Rails, rudder pedals & more (11/26/2015)
- Fuselage 25 – Prep for empennage attachment (11/29/2015)
- Fuselage 26 – Mounting the Horizontal Stab (12/5/2015)
- Fuselage 27 – Mounting the Vertical Stab (12/6/2015)
- Fuselage 28 – Vert Stab Attachment (12/12/2015)
- Fuselage 29 – Vert Stab Attachment (12/13/2015)
- Fuselage 30 – Mounting the elevators (12/24/2015)
- Fuselage 31 – Elevator and rudder attach (12/26/2015)
- Fuselage 32 – Control System (12/27/2015)
- Fuselage 33 – Rudder & Elev Travel (12/28/2015)
- Fuselage 34 – Aft elevator stop (12/29/2015)
- Fuselage 35 – Fwd elevator stop (12/31/2015)
- Fuselage 36 – Rudder cables (1/3/2016)
- Fuselage 37 – Conduit & Misc (1/5/2016)
- Fuselage 38 – Rear rudder pedals (1/9/2016)
- Fuselage 39 – Rear rudder pedals (1/10/2016)
- Fuselage 40 – Battery tray (1/12/2016)
- Brakes 1 (6/18/2020)
- Wheels & Tires (7/9/2020)
- Baggage Door (1/3/2021)
- Wing Attach (8/11/2021)
Show Planes Fastback Conversion (319.75 hours) (includes canopy work)
- Showplanes Fastback (5/18/2015)
- Fastback 1 (8/1/2015)
- Fastback 2 (8/2/2015)
- Fastback 3 (8/6/2015)
- Fastback 4 (8/9/2015)
- Fastback 5 (8/15/2015)
- Fastback 6 (8/16/2015)
- Fastback 7 (4.0 hrs) (8/17/2015)
- Fastback 8 (5.0 hrs) (8/25/2015)
- Fastback 9 (4.0 hrs) (8/26/2015)
- Fastback 10 (5.0 hrs) (8/31/2015)
- Fastback 11 – Cockpit rails (11/5/2015)
- Fastback 12 – Vert Stab Modification (11/28/2015)
- Fastback 13 – Riveting turtledeck (1/1/2016)
- Fastback 14 (3/13/2016)
- Fastback 15 (5/22/2016)
- Fastback 16 (5/26/2016)
- Fastback 17 (5/28/2016)
- Fastback 18 (5/30/2016)
- Fastback 19 (6/11/2016)
- Fastback 20 (6/15/2016)
- Fastback 21 (6/20/2016)
- Fastback 22 (6/23/2016)
- Fastback 23 (6/24/2016)
- Fastback 24 (6/30/2016)
- Fastback 25 (7/1/2016)
- Fastback 26 (7/2/2016)
- Fastback 27 (7/3/2016)
- Fastback 28 (7/5/2016)
- Fastback 29 (7/8/2016)
- Fastback 30 (7/9/2016)
- Fastback 31 (7/17/2016)
- Fastback 32 (7/31/2016)
- Fastback 33 (8/6/2016)
- Fastback 34 (8/8/2016)
- Fastback 35 (8/15/2016)
- Fastback 36 (8/19/2016)
- Fastback 37 (8/21/2016)
- Fastback 38 (2/24/2017)
- Fastback 39 (2/25/2017)
- Fastback 40 (4/11/2017)
- Fastback 41 (6/11/2017)
- Fastback 42 (6/19/2017)
- Fastback 43 (6/30/2017)
- Fastback 44 (7/2/2017)
- Fastback 45 (7/4/2017)
- Fastback 46 (7/21/2017)
- Fastback 47 (7/22/2017)
- Fastback 48 (7/23/2017)
- Fastback 49 (8/2/2017)
- Fastback 50 (8/9/2017)
- Fastback 51 (8/11/2017)
- Fastback 52 (8/12/2017)
- Fastback 53 (8/15/2017)
- Fastback 54 (8/16/2017)
- Fastback 55 (8/17/2017)
- Fastback 56 (8/18/2017)
- Fastback 57 (8/19/2017)
- Fastback 58 (8/22/2017)
- Fastback 60 (8/25/2017)
- Fastback 61 (10/10/2017)
- Fastback 59 (10/10/2017)
- Fastback 62 (12/15/2017)
- Canopy Work and New Toys (9/26/2019)
- Roll Bar (3/12/2021)
- Canopy Installation (4/19/2023)
Firewall Forward (285 hours)
- Engine Purchase (1/17/2017)
- Engine Mount (6/24/2020)
- Hanging Engine (7/10/2020)
- Whirlwind 74HRT Prop Install (8/18/2020)
- Throttle Quadrant (9/7/2020)
- Red Cube Fuel Flow (9/26/2020)
- Oil Cooler Install (12/19/2020)
- Cowling (12/27/2020)
- Baffles 1 (1/12/2021)
- Snorkel and Air Filter (1/17/2021)
- Avionics 1 (7/4/2021)
- Sniffle Valve and Ignition Harness (11/22/2022)
- Finalizing Baffles (12/14/2022)
- Fuel Line Fittings (2/14/2023)
- Oil Lines, Baffle Shrouds, and Other FWF (2/18/2023)
- Baffle Seals (2/20/2023)
- Heat Muff Installation (2/23/2023)
- Misc wrap up work (4/21/2023)
- Post first start corrections (4/24/2023)
Painting and Detailing (48 hours)
- Making a home paint booth (6/27/2015)
- Paint Booth (7/12/2015)
- Paint Shop – Completed (7/25/2015)
- Eastwood Paint Gun (3/7/2016)
- Interior Paint Prep (4/3/2016)
- Interior Paint 1 (4/22/2016)
- Interior Paint 2 (4/24/2016)
- Interior Paint 3 (4/25/2016)
- Interior Paint 4 (5/14/2016)
- Interior Paint 5 (5/19/2016)
- Interior Paint 6 (5/20/2016)
- Interior Paint 7 (11/26/2022)
Electrical (252 hours)
General Electrical (95 hours)
- Sportair Electrical Systems & Avionics (9/12/2015)
- Landing Lights (6/23/2021)
- Antennas 1 (8/30/2021)
- Nav & Strobe Lights (11/7/2021)
- ELT Installation (12/29/2021)
- Elevator Trim Installation and Wiring (3/12/2022)
- Removal of stall warning, switch panel, fuselage wiring (6/12/2022)
- Starter solenoid wiring, pitot wiring, fuel vents. (8/12/2022)
- Capacitive fuel sender, nav/strobes and other aft wiring (9/1/2022)
- Panel cutting & fitment plus lots of wiring (9/6/2022)
- Cabin Lighting Testing and Installation (9/15/2022)
- General Wiring Work (10/6/2022)
- FWF Wire Routing and Termination (3/5/2023)
- Magneto Ignition Harness and Prop Safety Wire (3/5/2023)
- FWF Work. Ignition wires and oil temp sensor. (3/18/2023)
Primary Power (42 hours)
- Electrical System Planning (7/1/2021)
- Avionics layout, test panel fab, and bus layout planning (12/23/2021)
- Starter solenoid wiring, pitot wiring, fuel vents. (8/12/2022)
- Primary Power Panel Wiring (10/15/2022)
- Pre-power wiring (11/9/2022)
Avionics (128 hours)
- Avionics 1 (7/4/2021)
- Avionics layout, test panel fab, and bus layout planning (12/23/2021)
- Harness Building on the Bench (1/22/2022)
- Panel Switches (9/18/2022)
- GMU11 Install (9/20/2022)
- Initial Panel Power Up! (11/11/2022)
- GNC Setup (11/13/2022)
- GEA 24 Wiring (11/20/2022)
- Headset wiring (11/20/2022)
- Radio Transmit Troubleshooting (11/20/2022)
- GEA24 Wiring 2 (11/21/2022)
- CAN BUS ERROR!!! OH GAWD! (3/28/2023)
- Instrument Panel Finalization (4/11/2023)
- Magnetometer and AHARS Calibration (4/26/2023)
Finishing (25 hours)
- Finish kit + cowl and extras (7/11/2015)
- Finishing Kit (9/6/2015)
- Finish Kit Arrives (9/18/2015)
- Fly EFII Fuel Pump Installation (7/26/2020)
- Gear Intersection Fairings 1 (11/22/2021)
- Seat belts and wing fairings (5/1/2023)
- Magneto Washers & Weight and Balance Prep (5/4/2023)
Final Testing (67 hours)
- Service Bulletin 16-12-16 (11/20/2022)
- Flap calibration and brake bleeding (4/14/2023)
- Fuel flow testing and fuel tank calibration (4/18/2023)
- Pre-first start inspections and corrections (4/20/2023)
- First Engine Start! (4/23/2023)
- Post first start corrections (4/24/2023)
- First Taxi Test & Brake Wear In (4/25/2023)
- Magnetometer and AHARS Calibration (4/26/2023)
- ELT Testing & Data Plate Installation (5/2/2023)
- Dynamic Prop Balance (5/10/2023)
- N-Number, Inspection Panels, & Misc (5/10/2023)
- Weight and Balance (5/10/2023)
- Pitot Static & Transponder Certification (5/12/2023)
- Airworthiness Application (5/18/2023)
- Final Airworthiness Inspection Prep (5/24/2023)
- Airworthiness Inspection! (5/25/2023)
Uncategorized Posts & Topics
- Quick Update (1/12/2013)
- Practice Kit (3/16/2013)
- Hangar!!! (4/27/2014)
- Photos, Videos and More (9/14/2014)
- New Hangar (11/17/2014)
- Hangar Cleanup (11/22/2014)
- Hangar Improvement (12/29/2014)
- Support Pilot’s Bill of Rights 2 (3/2/2015)
- A few website changes (9/21/2015)
- Site Update (1/22/2016)
- Engine Purchase (1/17/2017)
- Past 6 Months (2/25/2017)
- Distractions (7/5/2017)
- Shop Update (7/21/2019)
- FAA Updates to Phase 1 Testing – Task Based Testing Approved (5/18/2023)