Flaps 5 (2.5 hrs)


Not a lot to report for today’s post. I deburred all of the rivet holes for all parts on both flaps. I still need to deburr edges, and then dimple prime and rivet.

In other news, my leading edge landing light fixtures arrived from Duckworks Aviation. I got the blank install plates without lights. Currently I’m planning to use the Baja Designs LED’s that Mike Bullock is using, but who knows what may come out between now and finishing this airplane… I’ll wait a bit 🙂 I’ll provide a thorough explanation of why I’m going with leading edge lights instead of wingtip lights when I conduct the install.  Cheers!

IMG_6432.JPG


About Peter

plbarrett.com | Certified Flight Instructor (Single & Multi-Engine, Instrument, and Advanced Ground) | Commercial Helicopter

Leave a comment