Fuselage


Canopy Installation

This post covers a couple different shop sessions, but it easiest to combine all here. First I installed the canopy on the rails. Next I started installing all of the latch mechanisms. I’m pretty sure I covered that on here way back when I initially did all the work. I did have to make some slight changes to the locking mechanism lengths.

I also created strike plates out of plastic at each end of the locking mechanism. I completed the taxi latch position. I used some tape and a little pressure to mark the appropriate drilling location.

I’m really happy with the result. The lock is still pretty stiff, but I suspect it will loosen with time. Also I over adjusted the gas strut, and it has less power than I would like. I’ll probably replace it at some point. (Edit: I replaced with one provided by my buddy Keith. I kept it much more stiff and I’m very happy with it.)


Roll Bar

My buddy Jared had previously come over and tack welded the roll bar. He then took it back and had one of his guys TIG weld it. I did a check of the level, and then it got sent back for powder coating. I’m very happy with the final result!