Misc wrap up work


Getting ready for the first engine start… but most of the things on my checklist for the engine start are complete. Many of the remaining items on my list need to wait until after the first start. So I worked on a number of small projects – some needed in the near future. Others not needed until whenever I decide I want them done.

Projects accomplished tonight. Some temporary seat covers made from pillow cases. Instrument panel white led lights hooked up. Foil added to the bottom cowl. Wheel pant fiberglass work. The instrument panel white LED lights are bright and will need adjustments. First, I need to bring them aft about one inch. This will provide much better visibility and reduce shadows on the panel. Second, I need to shorten the LED strip. Its a bit too long at the moment, which means my eyes can catch direct light at both ends of the strips. Shortening the lights will have the secondary effect of reducing the amount of light output. Currently its a bit too much even a low levels.  Lastly, I’ll need to improve the wire routing – its a bit ugly at the moment, but its functional and works as a proof of concept. Plenty of time between now and final paint!


About Peter

plbarrett.com | Certified Flight Instructor (Single & Multi-Engine, Instrument, and Advanced Ground) | Commercial Helicopter

Leave a comment