Elevators 26 (1.25 hrs)This entry was posted in Elevators Empennage on July 26, 2013 by Peter This evening I riveted the left elevator’s skeleton together. The only portion of the elevator skeleton not riveted is the counterweight skin. After I complete that, I plan to match drill and then dimple the new skin.