There is a ton to report in this post. I won’t be able to cover it all. I’ve been working hard to finalize all the electrical wiring and avionics installations. I’ve finally gotten to the area behind the panel and the instrument panel itself. Things that were accomplished in this session: final install of pitot static boa lines, final wrapping and organizing of all wires and cables, removal of instrument panel, carbon fiber wrapping instrument panel, reinstalling all switches and avionics into the panel, labeling all switches, elt nut plate installation, and installation of a few wires remaining for functionality such as fuel pump switch to bus power and power for panel led lights.