Fuselage 7 (1.5 hrs)This entry was posted in Fuselage Main Fuselage on May 31, 2015 by Peter Leaving off from last session, we pick right backup by installing the nut plates on the angles shown below. Then it was time for more match drilling. In this instance the rear seat footwells and web inserts. 39.3704777-76.9663879