Wing Spars 1 (4.0 hrs)

I did an inspection, marked the spars, and began figuring out what the next step is. The answer is fuel tank nut plates.  I messed around with several setups before I found one that I like, and began final drilling the attachment holes.  In the process I actually broke a countersink bit!  I also did a major clean up of the garage and some more organization.  I should be able to get some real work done on the spars in the next session.

20130921-230218.jpg

20130921-230229.jpg


Elevators 30 (4.0 hrs)

I really hated rolling leading edges until today.  Well, I still hate it, but not as much.  I’ve been using a pipe given to me by another builder that is about 1″ in diameter.  It works well, but I was still getting a ripple. My solution was to use two pipes.  A smaller diameter pipe, and the original 1″ pipe.  I started with the smaller pipe and make sure that the edge got a good bend and then moved up to the larger pipe.  This worked extremely well.

Here in the first photograph you can see my first attempt with rather substantial wrinkling between the clecos.

20130921-141759.jpg

And here are the results using two pipes for the roll.  What a difference!  I don’t call anything perfect, but this is darn close!

20130921-141738.jpg20130921-141748.jpg20130921-141810.jpg

I redid the original bend with the smaller pipe and was able to take out many of the wrinkles, but now all as you can see here. 20130921-141821.jpg

Completed products.20130921-141834.jpg

20130921-141845.jpg

I temporarily installed the elevators onto the horizontal stab for storage.  They’re on backwards I might add, but it was easier to put them on this way with the way I had the bench setup.  Its just temporary so it doesn’t matter.  There are still several items to complete on the empennage but they seem to make more sense for when its attached to the fuselage.  (Things like the elevator trim servo, drilling the horns, etc)20130921-141856.jpg