Service Bulletin 14-01-31 (1)

After my last session in the hangar, I decided I would make a list of projects to complete while waiting for the painting of the cockpit interior. There are several things I could continue to work on inside the cockpit, but I’d like to avoid removing items only to later reinstall to the maximum extent possible. With that in mind, the first task on the top of my list is a big on. Service Bulletin 14-01-31. If you’re a builder or a flyer of Van’s Aircraft, you’re likely already aware of this one. Van’s identified cracks in the front spar of the horizontal stabilizer and issued this service bulletin as a corrective measure. Technically, to comply with the SB, you do not need to make the modifications until cracks are detected. However many people, myself included are doing it as a preventative measure. That being the case, this is no small or easy project.

In a nutshell this SB adds two reinfocements to the front spar at the point they intersect with the first rib. You can see these reinforcements in the following photo. To accomplish this, the innermost ribs and both reinforcement angles must be removed. What makes it tricky is that some of these rivets will be difficult to access, and therefore the likelihood of making a mistake is fairly great. I’ve given a lot of thought as to whether or not to do this now, or to wait. Its not going to become more enjoyable with time, and I certainly won’t want to do it after the airplane is flying and painted! img_9514.jpeg

I’ve given careful consideration as to how I’m going to do this. I have an excellent rivet removal tool that makes the rivets it can access a breeze to remove safely and properly. Using it, I removed all the rivets in the skin, per the directions on the top side of the stab. The instructions call for removing all the rivets connecting all four ribs (2 per side) to the skin, plus the two most inboard rivets from the front spar. Some other builders who have completed this repair have removed more rivets on the skin in order to gain better access. For now, I’m sticking with the instructions, and I’ll deviate if and when it is necessary to do so. I’m giving some consideration to buying new ribs and angles as a prevantive measure as well. For now, I’m going to see how removal goes, and I will replace parts as appropriate. Here you can see what I accomplished tonight. (I also had to remove the horizontal stab from the fuselage)

As you can see, the rivet removal tool and good technique leaves a flawless result. If I can manage this on the inner rivets we’ll be in business!


Elevators 30 (4.0 hrs)

I really hated rolling leading edges until today.  Well, I still hate it, but not as much.  I’ve been using a pipe given to me by another builder that is about 1″ in diameter.  It works well, but I was still getting a ripple. My solution was to use two pipes.  A smaller diameter pipe, and the original 1″ pipe.  I started with the smaller pipe and make sure that the edge got a good bend and then moved up to the larger pipe.  This worked extremely well.

Here in the first photograph you can see my first attempt with rather substantial wrinkling between the clecos.

20130921-141759.jpg

And here are the results using two pipes for the roll.  What a difference!  I don’t call anything perfect, but this is darn close!

20130921-141738.jpg20130921-141748.jpg20130921-141810.jpg

I redid the original bend with the smaller pipe and was able to take out many of the wrinkles, but now all as you can see here. 20130921-141821.jpg

Completed products.20130921-141834.jpg

20130921-141845.jpg

I temporarily installed the elevators onto the horizontal stab for storage.  They’re on backwards I might add, but it was easier to put them on this way with the way I had the bench setup.  Its just temporary so it doesn’t matter.  There are still several items to complete on the empennage but they seem to make more sense for when its attached to the fuselage.  (Things like the elevator trim servo, drilling the horns, etc)20130921-141856.jpg


Elevators 29 (1.0 hr)

Rolling the leading edges is officially my least favorite thing to do.  In other words… it stinks.  I’m not going to go into much detail.  Suffice it to say that the right elevator leading edge is about 50% done, but it took entirely too long to get this far.  With my 1″ pipe the edges weren’t coming together in the way I would like.  I used my hands and got it close.

The endeavor got me thinking.  The pipe seems to bend it in the middle.  Near the edge and near the spar the aluminum is straight.  What I’ve decided to try is a couple other pipes of different diameter to get the bend closer to the way I want before riveting.  I’ll tackle that this weekend. 20130918-192851.jpg20130918-192905.jpg20130918-192921.jpg20130918-192913.jpg

20130918-193000.jpg