Elevators 4 (2.0 hrs)
Tonight I finished all of the final drilling and removed all of the stiffeners. I have labeled each stiffener according to position and elevator. (ex. G, RB for right bottom) Knowing that the labels will be removed as I clean the stiffeners for priming, I labeled their location on my priming table. As long as I don’t move things around haphazardly, I can keep track of all the pieces. After labeling, I was able to deburr all the holes and get about 2/3 of the scotchbrite priming prep done on the stiffeners. I will still need to scotchbrite the remaining stiffeners, the rudder skeleton, and the interiors of the elevator skins before I clean and then prime. I’m hoping to be done the priming process and maybe even get to riveting this weekend.