Ailerons 12 (1.0 hr)
So it looks like I’ll be moving to a new hangar… one with a concrete floor! There are two available and I’ve decided to move into this one. As a bonus its just across from Bullock’s Tool Lending Emporium which is perfect for a sponge like me.
This evening I started the assembly of the left aileron. First up was attaching the counterweight to the nose ribs.
Then I riveted the spar reinforcement plates and plate nut to the spar.
Then it was time to put the aileron in my little jig / stand.
I started to rivet the top of the spar, but I didn’t get far as I didn’t have the time or the energy this evening.