Daily Archives: October 27, 2013


Wings 5 (7.0 hrs)

Here are the wing ribs prior to priming.  Squire is, as always, extremely excited to be part of the priming process.  If only I could get him to use the HVLP gun. Due to my poor estimation of primer required, priming took more than twice as long as it should have.  I really should take notes so I can properly estimate these things…. 20131027-144855.jpg

My first batch of primer got me almost half way. In a previous post, I mentioned some poor performance of the HVLP gun.  After the thorough cleaning and care I gave it last week, it performed better than it ever has, and I couldn’t be happier with this priming job!20131027-144906.jpg

Finally the ribs and spars are hung on the wing stand!  The outboard ribs still need to be fitted as I don’t have the main spars correctly attached to the stand.  I wanted to see how everything looked first, and give it some thought before proceeding.  Regardless, I’m very happy with the progress this weekend.  Now I need to redo the tie down brackets, and order conduit. 20131027-174821.jpg

20131027-174754.jpg


Wings 4 (8.0 hrs)

Since last weekend I didn’t get barely anything done on the project, I wanted to devote as much time as possible this weekend.  I started by drilling the conduit holes for routing the wiring in the wings.  I’ve decided on two conduit routes (shown here).   The first is the 3/4 inch hole that runs between the third and fourth lightening hole at the bottom.  This will be the primary conduit line and runs to both wingtips.  I also enlarged the tooling hole near the main spar.  This goes as far as the bell crank and can be used for pitot heat and the roll servo.  I’m still contemplating extending this to the wingtip.

Next I deburred all of the conduit holes and then clecoed the ribs, main spar, and rear spar together.  I final drilled the ribs and spars together and deburred all the holes.  My final step was to begin preparing for priming.  All of the ribs got the scotchbrite treatment and final cleaning for priming.

I didn’t take any photos of the conduit drilling process.  I used a step bit for the holes.  A good tip is to take a marker and draw a line on the outside of the step bit at the correct diameter so you don’t accidentally go too far.  It takes several times of drilling before the ink wears away.

Here you can see the spars and ribs clecoed together. 20131027-001844.jpg

The larger 3/4″ conduit hole. 20131027-001857.jpg

The tooling hole drilled out to 5/8″20131027-001911.jpg

20131027-001926.jpg

Beginning the deburring and scotchbrite primer prep process. 20131027-001937.jpg

20131027-001952.jpg

I labeled each of the ribs on the left from the tip to the root L1 to L14 and the same for the right wing.  After scuffing the surfaces with the scotchbrite pads, I used the long shipping crate and laid the ribs out in order.  I wanted to keep everything in order so that when I used the acetone to clean the ribs I wouldn’t lose track of what went were. 20131027-002002.jpg