Monthly Archives: April 2013
Vertical Stab 3 (3.0 hrs)
Today I finished all the match drilling including the skin. All deburring is done, and I got a good start on dimpling the internal parts.
I’m contemplating my next priming. I can either do the vertical stab as one batch, or begin work on the rudder. Right now, I’m leaning towards doing a small batch for the vertical stab to keep my momentum going. It’s good to make tangible progress in the firm of completed parts.
Vertical Stab 2 (2.0 hrs)
I got a fair amount done today. My pace and efficiency has really improved. I didn’t know what I was doing when I started the horizontal stab and everything was painfully slow.
I started the day by using the soldering iron to remove the protective coating. Quick and easy.
Next up was the rear spar. Clecoed and match drilled.
I fluted the ribs using the previous method from Hints for Homebuilders, and clecoed the skeleton together for match drilling.
The entire skeleton is match drilled. Next time I’ll be match drilling the skin.