Wing Spars 4 (3.0 hrs)

Today I finished all of the countersinking for the spar nut plates.  I also attached all of the nut plates (for both the fuel plate and the inspection panels) to the bottom of both spars.  I did not prime the countersinks for the rivets prior to riveting but I did prime the screw countersinks after riveting the nut plates.  All that remains is to flip the spars and rivet / prime on the other side.  This part is quick and I hope to get back out to the garage before my primer hits its pot life today to finish up.  Next up, I believe will be the Z-brackets.

Here’s a shot of the finished countersink for the inspection access plates. 20130929-133437.jpg

20130929-133459.jpg

I drilled, deburred and dimpled all of the access plates and labeled them to their corresponding location.  I did not follow Van’s procedure for these countersinks either.  I again used my back plate with a pilot hole.  The instructions say to use the #40 countersink… and you would have to if you were using the nutplates as the pilot hole, but since I used the backing plate, and the holes had to be drilled out to #28, I used the #30 again.  These countersinks came out perfect as you can see here. 20130929-133511.jpg

20130929-133530.jpg

Here’s a look at my q-tip primer application.20130929-133551.jpg

Almost complete….20130929-133617.jpg


Wing Spars 3 (3.0 hrs)

No photographs today.  All I did was complete the #8 screw countersinks on the spars.  It was extremely slow going having to re-clamp my guide piece each time, but the results were worth it.  I could have gotten the same amount of work done soooo much quicker using Van’s method…


Wing Spars 2 (3.0 hrs)

Ok, so countersinking and setting the fuel tank nut plates is taking me way longer than it should, but for good reason.  I spent quite a lot of time experimenting, fine tuning and researching the correct method.

There are essentially two methods one can use to countersink the holes for the #8 screw that will attach the fuel tank to the nutplates installed on the spar.  Its also important to note that the outside diameter of the countersink should be 0.375 inches.  (Good references can be found here.  And here.)

  1. Van’s Method:  According to the instructions, you can dimple the rivet holes and then install the nutplates prior to countersinking the center hole for the #8 screw.  The reason you want to instal the nutplate first is that the #30 countersink can “chatter” and cause an oblong or deformed hole as the pilot has no hole to guide it and keep it centered.  The installed nut plate acts as that guide.  I tried this on two separate installations, and it resulted in a perfectly centered countersink.  What I did not like, however, was the impact to the nutplate.  The rotating countersink caused just the most minor of wear on the threads inside the nutplate.  I tested both with a #8 screw and compared them to nutplates that had not been used yet.  It was definitely harder to turn the screw in the two nutplates that had been used as the guides for the countersink.  Do I think this would be a problem?  Actually, probably no.  But it does increase the risk of cross threading a screw, and I don’t want to take that risk.  And for this reason alone I went with option two…
  2. Chokoway Method:  I think thats what this is called, and I assume named for a builder I’ve never met.  Anyways, this method has you make a countersink guide plate and hold that plate under the countersinks with clamps.  I used an old piece of aluminum angle, drilled with a #30 drill bit.  This method works perfectly for producing a nicely centered countersink.  The significant downside is time.  You have to unclamp, align, and reclamp for every countersink… and there are a lot.  I would estimate this method takes three times as long as the Van’s method.  Regardless, I prefer this method.

I have all of the rivet countersinks complete, and about half of the center countersinks complete.  Once I have completed all of the countersinks, riveting the nutplates in place will be very quick and painless.

20130922-175658.jpg

20130922-175710.jpg

20130922-175720.jpg

20130922-175731.jpg

20130922-175742.jpg

 

I’ve also been rearranging my shop and trying new things to optimize my time.  The wings require reference to multiple schematics at once, which was not the case for the empennage.  My lone schematic easel is not sufficient, so I just tacked up the other two that I currently need.  I taped the preview plan version of some of the other schematics up on the right for quick reference if needed. 20130922-175801.jpg

20130922-175812.jpg

My last project for the day was the shipping crates.  We have a farm, and on a farm you never throw good wood out.  You never know when it might come in handy.  I keep a large pile of scrap wood and misc building supplies in the equipment shed.  I decided to put both the crates there until I figured out a good use for them.  Since I already had the tractor out, I decided to make the task that much easier.  So much less work to move and stack large items when you’ve got a front end loader and a chain!20130922-175831.jpg