Horizontal Stab 13 (4.5 hrs)

Today was the best day I’ve had working on the kit. I’ve received the parts from Van’s earlier this week. (I was given some great advice about ordering from Van’s: Call rather than use the web, and ship via USPS priority mail. I ordered the parts on a Friday afternoon. Monday was a federal holiday, and I received the parts on Tuesday!) The parts were the HS-404 and HS-405 to correct the previous mistakes.

Here are the parts. (I ordered an extra 404 just in case the other one needed to be replaced as well)

20130223-124810.jpg

 

In order to fit the new 404 and 405 I would have to cleco the skeleton’s and skins back together for both sides. Here is the right side: (and yes, I did notice the front spar is backwards…)

20130223-124916.jpg

 

Here are the markings for the cutouts to the HS-404:

20130223-130122.jpg

 

And the 404 after cutting:

20130223-132438.jpg

 

The 404 is clamped into place, and then match drilled to the center line of the flange.

20130223-141228.jpg

 

The holes shown below are for the rivets that hold the HS-404 to the front spar and the HS-405 main rib. Everything is within specs! (Digital calipers are a must)

20130223-141256.jpg

 

Here is the 405 in place. I didn’t take any pictures of the fluting process, but I’m happy to report it went well. This was my first attempt at fluting, as all the other ribs had been fluted by the previous owner of the kit. I watched a quick video on fluting via the Hints for Homebuilders on EAA’s website. I nailed it on the first attempt. Using the technique in the video, I held the rib flat to the table with my thumb and then fluted between the marks for every other hole. I would squeeze just hard enough to watch the end raise slightly. I used a metal ruler to check the straightness. It wasn’t perfect on the first pass, so I put a very light flute in the gaps I had skipped. Worked perfectly.

20130223-144749.jpg

 

20130223-184644.jpg

20130223-184707.jpg

20130223-184719.jpg

20130223-184731.jpg

20130223-184738.jpg

20130223-184744.jpg


Horizontal Stab 12 (2.5 hrs)

I decided to use some scrap aluminum that I have laying around to see what a shim might look like for the HS-404 problem I have.  In the first picture you can see the slight mis-alignment of the holes in the HS-404 and the front spar…

20130215-120137.jpg

Here’s the shim I made from scrap aluminum:

20130215-120145.jpg

And here is the shim between the HS-404 and the front spar:

20130215-120152.jpg

20130215-120201.jpg

20130215-120209.jpg

After I made the shim, I posted to Rivetbangers and decided to mull over the problem a little more as I did some more work on the stab.  I match drilled the entire right horizontal stab with the exception of the HS-404 (due to the above).  The outside portions of the HS-810 and HS-814 reinforcement pieces still need drilled as well.  I took the stab back apart and deburred and scuffed all the parts in preparation for priming.  I’m going to do the same thing for the left side, and by the time I’m done, I should have come to a decision on my two problem parts.  Right now I’m leaning towards replacement.  While there are a few very workable solutions, I don’t like the idea of compounding errors.  In the case of the HS-404 we could potentially have the shim AND the mis-aligned holes.  Aligning the holes may very well create another problem… edge distance.  With regards to the HS-405 on the other side, Mike Bullock’s solution may well be the way I go… re-drill, maybe add a third rivet, and press on.  I assume you have to pay attention to edge distance between holes as well…

Here are pictures of the prepped parts ready for priming:

20130215-143045.jpg