141 total posts

Landing Lights 1 (5.0 hrs)

Installation of Duckworks Leading Edge Landing Light assembly on the wings of a Van's Aircraft RV-8 kit built plane.

Wings 28 (5.0 hrs)

In today's post I temporarily attach the fuel tanks to the spars, complete all four scarf joints, and prime all the skin overlap joints.

Wings 21 (11.0 hrs)

Priming of RV-8 Wing skins, and pitot tube install.

Chronological Archive