Landing Lights 1 (5.0 hrs)
Installation of Duckworks Leading Edge Landing Light assembly on the wings of a Van's Aircraft RV-8 kit built plane.
Category
Wing construction, tanks, ailerons, flaps, and the many ways a cleco can hide in plain sight.
Build 482.75 hrs
141 total posts
Installation of Duckworks Leading Edge Landing Light assembly on the wings of a Van's Aircraft RV-8 kit built plane.
In today's post I temporarily attach the fuel tanks to the spars, complete all four scarf joints, and prime all the skin overlap joints.
Priming of RV-8 Wing skins, and pitot tube install.