Cowling
85 images. Fabrication, fitment, and installation of the cowling. Post covers multiple shop sessions.
Media
Photo-heavy posts from the build, final testing, flying, and maintenance record.
85 images. Fabrication, fitment, and installation of the cowling. Post covers multiple shop sessions.
63 images. Mike Bullock and I made a trip to Sun N Fun International Fly in at Lakeland Airport Florida. Sun N Fun is awesome! Even better th
39 images. Maintenance and tweaks in the first 7 hours of flying.
37 images. I fly as self loading luggage in Mike Bullock's RV-7 to Airventure Oshkosh 2014!
36 images. Installation of Duckworks Leading Edge Landing Light assembly on the wings of a Van's Aircraft RV-8 kit built plane.
35 images. In today's post I temporarily attach the fuel tanks to the spars, complete all four scarf joints, and prime all the skin overlap j
35 images. GNC was not communicating properly with the G3X system. Troubleshooting and solution.
34 images. A ton of work on the cleaning up the canopy bonding, sanding, and instrument panel cover work. Multiple shop sessions covered.
33 images. A 21 day cross country adventure in the RV 8, from Maryland to Zion and back, filled with friends, flight challenges, and unforget