Blackstone Reports #2 and #3: The Break-In Arc
A working draft on N22UP's second and third oil-analysis reports and the three-sample wear trend they created across Phase 1.
Maintenance
Oil changes, squawks, inspections, tuning, and the practical follow-on work that starts after the first-flight grin settles down.
A working draft on N22UP's second and third oil-analysis reports and the three-sample wear trend they created across Phase 1.
A working draft on N22UP's first Blackstone oil-analysis report and what the first seven hours of break-in looked like in the filter and the lab data.
Oil change and miscellaneous RV-8 maintenance notes from July 2023.
After months chasing a phantom prop hub leak, the real culprit turned out to be a loose NPT fitting with the wrong sealant.
The oil pressure has been on the low side of good since the first flight. Time to adjust the pressure relief valve.
Investigating the nose seal oil leak.
Fiberglass relief to prevent cowl rubbing, and removing the leaky oil cooler bypass valve.
Maintenance and tweaks in the first 7 hours of flying.
A working draft covering the first major N22UP maintenance pause between the early June flights and the July 2 return to the air.
First flight of N22UP!!!!!