Skip to content

Peter's RV-8

RV-8 Fastback | papalimabravo.com

RV-8 Fastback | papalimabravo.com

  • Home
    • Flying
    • Construction
      • Empennage
      • Wings
      • Fuselage
      • Firewall Forward
      • Electrical
      • Finishing
      • Final Testing
      • Painting and Detailing
      • Tools
    • Maintenance
    • Plans
  • About
    • About
    • Lessons Learned
    • Major Decision Points
    • Show Planes Fastback
  • Media
  • References
  • Tools & Supplies
  • Index
    • Main Index
    • Flight
  • Contact Me
Home » Fastback 40 » Page 49

Fastback 40

This entry was posted in Construction Fuselage Showplanes Fastback on April 11, 2017 by Peter

IMG_2175 IMG_2174 IMG_2173 IMG_2172 IMG_2171 IMG_2157 IMG_2156 IMG_2155 IMG_2154 IMG_2153 IMG_2152 IMG_2151 IMG_2150 IMG_2149 IMG_2148 IMG_2146 IMG_2145 IMG_2144 IMG_2147


Fastback 39

This entry was posted in Showplanes Fastback on February 25, 2017 by Peter

Really not a whole lot to tell for this post. I did a fair amount of sanding and finishing for the canopy skirt.

I also installed the desiccant plugs mike gave me for my engine. 


Fastback 38

This entry was posted in Showplanes Fastback on February 24, 2017 by Peter

Previously I got back to the airport to do a good cleanup and try to figure out where I was after a long absence.

My buddy Mike left me desiccant inserts for my new engine. 


Post navigation

  • ← Older posts
  • Newer posts →

Build: 2027.5 hours

Flying: 192.6 hours
Maintenance: 51 hours

View by categories:

Login
Disclaimer
Contact Me

· Powered by · Licensed under a Creative Commons Attribution-NonCommercial 4.0 International License