Skip to content

Peter's RV-8

RV-8 Fastback | papalimabravo.com

RV-8 Fastback | papalimabravo.com

  • Home
    • Flying
    • Construction
      • Empennage
      • Wings
      • Fuselage
      • Firewall Forward
      • Electrical
      • Finishing
      • Final Testing
      • Painting and Detailing
      • Tools
    • Maintenance
    • Plans
  • About
    • About
    • Lessons Learned
    • Major Decision Points
    • Show Planes Fastback
  • Media
  • References
  • Tools & Supplies
  • Index
    • Main Index
    • Flight
  • Contact Me
Home » General Wiring Work » Page 18

General Wiring Work

This entry was posted in Electrical General Electrical on October 6, 2022 by Peter


GMU11 Install

This entry was posted in Avionics Electrical on September 20, 2022 by Peter


Panel Switches

This entry was posted in Avionics Electrical on September 18, 2022 by Peter


Post navigation

  • ← Older posts
  • Newer posts →

Build: 2027.5 hours

Flying: 192.6 hours
Maintenance: 51 hours

View by categories:

Login
Disclaimer
Contact Me

· Powered by · Licensed under a Creative Commons Attribution-NonCommercial 4.0 International License