Hours Summary

Build
2027.5
Maintenance
51
Flight
192.6

Build Log

Follow the RV-8 from kit arrival through final testing and airworthiness.

Open the build hub

Flying

Training, trips, performance notes, and the post-build life of N22UP.

Open flying notes

Maintenance

Tuning, inspections, squawks, and lessons from keeping the airplane healthy.

Open maintenance notes

Major Build Sections

Full post index

Empennage

The tail kit, trim tab, rudder, elevator, and the first thousand small decisions.

Wings

Spars, ribs, tanks, ailerons, flaps, and all the patient aluminum work in between.

Fuselage

The airplane starts looking like an airplane, which is both encouraging and inconvenient.

Firewall Forward

Engine, baffling, cowling, controls, plumbing, heat, and everything that lives up front.

Electrical

Panel planning, wiring, power distribution, avionics, lighting, and continuity checks.

Final Testing

Inspection prep, weight and balance, first-flight readiness, and early test work.

Early Build Entries

construction

Workshop (0 hrs)

Currently I have a three car garage with a large storage attic. The third bay isn't used and has a larger door. I'm planning to set that area up as my

plans

N Number (0 hrs)

I reserved N888PB for my plane! <ArticleImage src={"/media/2012/08/20120803 1054311.jpg"} alt={"20120803 105431"} width={300} height={225} /