6 total posts

Trim Tab 4 (1.5 hours)

Tonight I set about making the rib let for the elevator. I started by lining the trim tab up with the elevator, and determining the amount that needed to b

Trim Tab 3 (2.0 hrs)

Today I met Mike at the hangar as he had agreed to give me a hand with the trim tab. I was able to complete the dimpling and countersinking of the skin and

Trim Tab 5 (2.0 hrs)

Rib let fabrication. Part two. I was determined that my second attempt at a proper rib let would be my last attempt, and thankfully it was. I'm really happ

Chronological Archive