14 total posts

Flaps 3 (6.0 hrs)

Match drilling the hinge and top skins for the flaps of a Van's Aircraft RV-8 kit built airplane.

Flaps 11 (2.5 hrs)

After priming the flaps in my last shop session, it was time to start final assembly. First thing first, I went to borrow my buddy Mike's heater. Its bette

Flaps 12 (6.0 hrs)

Final assembly of the right flap for a Van's Aircraft RV-8 kit built airplane.

Chronological Archive