I’ve decided to do the Show Planes Fastback conversion. I will use this page to be a one stop shop for all the posts that detail the required modifications, plus a general overview of the kit, the process, and the lesson’s I’ve learned along the way. Show Planes provides a number of aftermarket modifications and accessories including a modified cowl similar to the Sam James cowl. You can visit the website at www.showplanes.com. The kit costs just over $3,000 at my time of purchase. Almost everything you need is included, well packed, and they provided fairly comprehensive instructions. I am providing this page as an index of all the work required for the Show Planes Fastback modification. I am organizing the posts in two sections. The first is by subcategory, or section. The second is chronologically. In the first section, I will list posts that contain work on more than one section in both categories.

  1. Showplanes Fastback -

    Why did I chose the Show Planes Fastback modification?

  2. Fastback 1 -

    Delivery, unpacking, and inventory of the Show Planes kit.

  3. Fastback 2 -

    Began work on the aft turtledeck by preparing the bulkheads and match drilling with the skin.

  4. Fastback 3 -

    Removed turtledeck for deburring.

  5. Fastback 4 -

    Removing the original rails from the quick build fuselage. Preparing bulkheads for new rails. Match drilling new rails.

  6. Fastback 5 -

    Deburring and more deburring.

  7. Fastback 6 -

    Completed rail installation prep. Began work on the forward fuselage skin. Match drilled. Cut and removed section for installation of removable instrument cover. Fitted skin reinforcement strip.

  8. Fastback 7 (4.0 hrs) -

    When I attached the forward skin yesterday there were a few items I ignored in favor of focusing on the skin modifications. First among these were the bagg

  9. Fastback 8 (5.0 hrs) -

    First on today's agenda was to do a little practice for the double flush rivets I would need to set for the forward fuse skin to F 821afb. I did this by dr

  10. Fastback 9 (4.0 hrs) -

    Not a lot to report in this post. I deburred and dimpled both the forward and aft fuselage skins, and any miscellaneous parts associated with both that had

  11. Fastback 10 (5.0 hrs) -

    Lots of miscellaneous tasks in this post. First, I had been unsure how to position the nut plates shown in the first photo here. The instructions from Show

  12. Fastback 11 - Cockpit rails -

    Today I set about installing the rails for the ground adjustable rudder pedals. I immediately noticed that I had drilled every hole to the wrong size. The

  13. Fastback 12 - Vert Stab Modification -

    The Showplanes Fastback is slightly higher than stock at the intersection of the turtle deck and the vertical stabilizer. As a result, the front of the ver

  14. Fastback 13 - Riveting turtledeck -

    Riveted the aft upper-skin (turtledeck) to the fuselage and other misc work inside the aft fuselage.

  15. Fastback 14 -

    Fitting the fiberglass top for the rear seat and other misc fuselage work. Plus hangar wifi!

  16. Fastback 15 -

    Filling pinholes in the rear seat back top.

  17. Fastback 16 -

    Setup of instrument panel and instrument panel cover.

  18. Fastback 17 -

    Began riveting the modified forward front deck on the fuselage.

  19. Fastback 18 -

    Fabricating the fiberglass instrument panel cover and custom instrument panel.

  20. Fastback 19 -

    Installing the custom instrument panel, panel frame, and instrument panel cover.

  21. Fastback 20 -

    Joining fillets to instrument panel cover & other panel cover work.

  22. Fastback 21 -

    More work on the instrument cover and fillets.

  23. Fastback 22 -

    Further work on the instrument cover, and the initial work on the canopy skirt.

  24. Fastback 23 -

    More canopy skirt work, including hinge installation and additional trimming.

  25. Fastback 24 -

    Canopy skirt minor repair. Rear seat back top installation. Preparing canopy skirt bulkheads.

  26. Fastback 25 -

    Preparing the hinge cover plate and installing the forward canopy bulkhead.

  27. Fastback 26 -

    Installing the rear bulkhead on the canopy skirt.

  28. Fastback 27 -

    Trimming the canopy skirt for canopy installation and installing the center bulkheads aft of the roll bar.

  29. Fastback 28 -

    Affixing the lower skirt reinforcement rails.

  30. Fastback 29 -

    Cleaning up flox fillets. Ensuring proper alignment and adhesion for stiffeners and bulkheads on canopy skirt.

  31. Fastback 30 -

    Canopy skirt - Cleaned and sanded flox filets. Began laying micro balloon filets.

  32. Fastback 31 -

    Micro balloon fillets and edges.

  33. Fastback 32 -

    Applying fiberglass to rear bulkhead.

  34. Fastback 33 -

    Installing more fiberglass reinforcement.

  35. Fastback 34 -

    Completing fiberglass application, sanding, and first application of Rage Gold body filler for smooth transitions in the canopy skirt.

  36. Fastback 35 -

    Fill, sand, repeat.

  37. Fastback 36 -

    Sanding. Sanding. Sanding. Oh, and Rage Gold application. Yay!

  38. Fastback 37 -

    Sanding and more sanding. Tired of sanding.

  39. Fastback 38 -

    Finally trying to start working on the plane again. Sanding and Rage Gold work.

  40. Fastback 39 -

    More canopy skirt work and Rage Gold. Installed engine desiccant inserts.

  41. Fastback 40 -

    Beginning installation of canopy skirt latch mechanism.

  42. Fastback 41 -

    Instrument cover and carbon fiber work to canopy skirt.

  43. Fastback 42 -

    Instrument cover, filets, and latch bushing blocks.

  44. Fastback 43 -

    Canopy latch preparation.

  45. Fastback 44 -

    Canopy latch points in instrument panel and rear bulkhead.

  46. Fastback 45 -

    Canopy latch and lock work.

  47. Fastback 46 -

    Canopy latch setup.

  48. Fastback 47 -

    Canopy latch and skirt work.

  49. Fastback 48 -

    Canopy skirt priming and pin hole filling.

  50. Fastback 49 -

    Basic fiberglass for tonight.

  51. Fastback 50 -

    The big canopy cut!

  52. Fastback 51 -

    Final trimming of canopy and taper prep.

  53. Fastback 52 -

    Canopy drilling and mating prep.

  54. Fastback 53 -

    Two primary projects in this session – continued work on the front canopy fairing / filleting, and drilling the canopy.

  55. Fastback 54 -

    Flox fairing for skirt to canopy mating at front. Canopy prep.

  56. Fastback 55 -

    Work on the canopy skirt to canopy front fairing.

  57. Fastback 56 -

    Work on the front canopy skirt to canopy fairing.

  58. Fastback 57 -

    Tack welding the canopy latch to the roll bar frame. Bonding the canopy to the canopy skirt. Big day!

  59. Fastback 58 -

    Preparing the canopy for fiberglass layups around the bond.

  60. Fastback 60 -

    Canopy adhesive rivet finishing.

  61. Fastback 61 -

    A ton of work on the cleaning up the canopy bonding, sanding, and instrument panel cover work. Multiple shop sessions covered.

  62. Fastback 59 -

    Sanding and adhesive correction.

  63. Fastback 62 -

    More work today on the fillets that attach to the instrument panel cover and prevent airflow into the cockpit.

  64. Canopy Work and New Toys -

    Basic canopy hinge work and a number of new purchases.

  65. Roll Bar -

    Roll bar welding and powder coating.

  66. Canopy Installation -

    Canopy installation and latch work.