electrical Cabin Lighting Testing and Installation September 15, 2022 Updated April 27, 2023 electrical, general-electrical Build 4 hrs Testing the red led cabin lights to ensure they do not exceed the max 500mA of the GAD27 and installation. PreviousPanel cutting & fitment plus lots of wiring NextPanel Switches Related Posts general-electrical FWF Work. Ignition wires and oil temp sensor. general-electrical Magneto Ignition Harness and Prop Safety Wire general-electrical FWF Wire Routing and Termination