Vertical Stab 1 (0.25 hr)


Pulled out the major parts and plans for the vertical stab.  The horizontal stab took me entirely too long to complete.  Taking a class beforehand (if it wasn’t canceled) would have really helped.  But now I think I’ve got a really good handle on it, and I’m hoping to make quick work of this vertical stab!

20130407-164148.jpg


About Peter

plbarrett.com | Certified Flight Instructor (Single & Multi-Engine, Instrument, and Advanced Ground) | Commercial Helicopter

Leave a comment